Terminal 5 handles both grain and potash through two modern facilities. There is currently room for one additional dry bulk facility.
The preferred plan for Terminal 5 is to improve rail access for Columbia Grain by completing the South Rivergate Yard and looping the onsite rail system. Developing one new dry bulk facility including a new dock and storage building and a rail loop track configuration that will allow two facilities to operate where only one operates today.
Doubling the storage building capacity at Portland Bulk Terminal.